Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Harbor Boulevard Intersection Improvements News Image

Harbor Boulevard Intersection Improvements

Last Updated: 11/18/2026 Category: Roadway Current Phase: Planning and Project Approval

This project incorporates the design of safety improvements to the intersection of Harbor Boulevard and Access Road.

Read More

Indian Springs Cemetery Bank Stabilization News Image

Indian Springs Cemetery Bank Stabilization

Last Updated: 11/18/2026 Category: Other Current Phase: Construction

Repair of the bank adjacent to Alligator Creek due to erosion caused by Hurricane Irma in 2017

Read More

Indian Trail/Springwater Dr Street Light Replacement

Indian Trail/Springwater Dr Street Light Replacement

Completed Category: Roadway

Remove and replace all HPS streetlights with new solar lights and poles. The light poles being replaced are 40 years old. 

Read More

Kings Hwy Harborview Rd Intersection Improvements

Kings Hwy Harborview Rd Intersection Improvements

Last Updated: 11/18/2026 Category: Roadway Current Phase: Construction

Kings Hwy Harborview Rd Intersection Improvements. Traffic signal hardening. 

Read More

Manasota Key Beach Renourishment

Manasota Key Beach Renourishment

Last Updated: 11/18/2026 Current Phase: Planning and Project Approval

The second major renourishment of the Manasota Key shoreline.  This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.  

Read More

Mid-County Mini Transfer & Recycling Facility Roadway Reconfiguration and Truck Entrance

Mid-County Mini Transfer & Recycling Facility Roadway Reconfiguration and Truck Entrance

Last Updated: 11/18/2026 Category: Roadway Current Phase: Design Development

The design, permitting, and construction of a new gated access trucking road into the mini-transfer station. 

Read More

Northwest Port Charlotte MSBU Bridge Rehabilitations

Northwest Port Charlotte MSBU Bridge Rehabilitations

Last Updated: 11/18/2026 Category: Bridges Current Phase: Construction

Northwest Port Charlotte MSBU Bridge Rehabilitations - #014044 and #014045

Read More

NWPC Bridge Rehabilitation Chamberlain over Cheshire Waterway Project

NWPC Bridge Rehabilitation Chamberlain over Cheshire Waterway Project

Last Updated: 11/18/2026 Category: Bridges Current Phase: Design Development

NWPC Bridge Rehabilitation Chamberlain over Cheshire Waterway Project

Read More

Old Landfill Road Safety Improvements

Old Landfill Road Safety Improvements

Last Updated: 11/18/2026 Category: Roadway Current Phase: Design Development

Old Landfill Rd safety improvements.

Read More

View Full Projects Map

Delivering Exceptional Service

Questions? Issues?

Contact Us