Last Updated: 10/02/2026 Category: County Facilities Current Phase: Planning and Project Approval
The Cultural Center Replacement project was approved to move forward with masterplanning and programming by the Board of County Commissioners on March 12th 2024 following a series of public input activities and final presentation. The board granted $750,000 to proceed with advertising for a consultant. Additionally the direction was given to move forward with demolition of the existing facility scheduled for FY26. The full design and permitting phase is scheduled for funding in FY27 with construction funding in FY28.Last Updated: 10/02/2026 Current Phase: Design Development
Design of a new multi-purpose Special Needs Saferoom and Community Support Facility.
Last Updated: 10/01/2026 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the following Districts: Greater Port Charlotte, Lemon Bay, South Burnt Store.
2025 Annual Road and Bridge/MSBU Paving Program
Last Updated: 10/01/2026 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the following District: Road and Bridge, Englewood East, and Placida MSBU's.2025 Rotonda West/Pioneer Trail Annual Paving Program
Last Updated: 10/01/2026 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the Rotonda West District and Pioneer Trail.Ainger Creek Bridge - Emergency Repair
Last Updated: 10/01/2026 Category: Bridges Current Phase: Construction
Ainger Creek Bridge - Emergency RepairAlligator Creek Maintenance Dredge
Last Updated: 10/01/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of the Alligator Creek main channel.
Bridge Scour Study and Countermeasures
Last Updated: 10/01/2026 Category: Bridges Current Phase: Design Development
Bridge Scour Study and Countermeasures.Last Updated: 10/01/2026 Category: Drainage Current Phase: Planning and Project Approval
The Burnt Store Area Drainage Study seeks to identify areas that flood now, and areas that are expected to flood once the watershed is built out. The study will recommend conceptual improvements to alleviate this flooding.