Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

2024 Annual Paving Program

2024 Annual Paving Program

Last Updated: 11/18/2026 Category: Roadway Current Phase: Construction

The purpose of this project is to maintain the roadway system of Charlotte County in the following Districts: Greater Port Charlotte, Lemon Bay, South Burnt Store.

Read More

2024 Road and Bridge Paving Program News Image

2024 Road and Bridge Paving Program

Last Updated: 11/18/2026 Category: Roadway Current Phase: Construction

2024 Road and Bridge Paving Program

Read More

2025 Annual Road and Bridge/MSBU Paving Program News Image

2025 Annual Road and Bridge/MSBU Paving Program

Last Updated: 11/18/2026 Category: Roadway Current Phase: Construction

The purpose of this project is to maintain the roadway system of Charlotte County in the following District: Road and Bridge, Englewood East, and Placida MSBU's.

Read More

2025 Rotonda West/Pioneer Trail Annual Paving Program News Image

2025 Rotonda West/Pioneer Trail Annual Paving Program

Last Updated: 11/18/2026 Category: Roadway Current Phase: Construction

The purpose of this project is to maintain the roadway system of Charlotte County in the Rotonda West District and Pioneer Trail.

Read More

Ainger Creek Bridge - Emergency Repair

Ainger Creek Bridge - Emergency Repair

Last Updated: 11/18/2026 Category: Bridges Current Phase: Turnover and Closeout

Ainger Creek Bridge - Emergency Repair

Read More

Bridge Scour Study and Countermeasures

Bridge Scour Study and Countermeasures

Last Updated: 11/18/2026 Category: Bridges Current Phase: Design Development

Bridge Scour Study and Countermeasures.

Read More

Burnt Store Drainage Study News Image

Burnt Store Drainage Study

Last Updated: 11/18/2026 Category: Drainage Current Phase: Planning and Project Approval

The Burnt Store Area Drainage Study seeks to identify areas that flood now, and areas that are expected to flood once the watershed is built out.  The study will recommend conceptual improvements to alleviate this flooding.

Read More

Burnt Store Road East-West Connector News Image

Burnt Store Road East-West Connector

Last Updated: 11/18/2026 Category: Roadway Current Phase: Planning and Project Approval

Charlotte County has undertaken this study in response to the future growth along the Burnt Store Road Corridor.

Read More

Charlotte County Street Lighting LED Conversion

Charlotte County Street Lighting LED Conversion

Last Updated: 11/18/2026 Category: Roadway Current Phase: Planning and Project Approval

Charlotte County is continuing its effort to improve roadway lighting by converting older high-pressure sodium (HPS) fixtures to modern LED technology. The project delivers brighter, more reliable lighting while reducing energy use and long-term maintenance costs.

Read More

View Full Projects Map

Delivering Exceptional Service

Questions? Issues?

Contact Us