Disaster Recovery Site - Veterans Boulevard Signage/Lighting
Last Updated: 11/18/2026
This project will consist of replacing all light poles felled by Hurricane Ian.
Disaster Recovery Site - Winchester Boulevard Signage/Lighting
Last Updated: 11/18/2026 Category: Disaster Recovery Site Current Phase: Planning and Project Approval
This project will consist of replacing all light poles felled by Hurricane Ian.
Don Pedro/Knight Island Beach Renourishment
Last Updated: 11/18/2026 Category: Coastal Current Phase: Planning and Project Approval
The is a major renourishment of the Don Pedro/Knight Island shoreline. This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.Last Updated: 11/18/2026 Current Phase: Construction
The continued growth of Charlotte County requires an enhanced disaster response through a whole community approach and collaborative problem solving to ensure timely protective actions, a more educated, informed and prepared population and resilient infrastructure.
Last Updated: 11/18/2026 Category: Roadway Current Phase: Design Development
Flamingo/Edgewater Widening
Gasparilla Road Intersections Signalization
Last Updated: 11/18/2026 Category: Roadway Current Phase: Construction
Signalization project for the intersection of Gasparilla Road and Rotonda East Boulevard and the intersection of Gasparilla Road and Ingram/Ingraham BoulevardsGasparilla Road/Pioneer Trail Sidewalk Extension
Last Updated: 11/18/2026 Current Phase: Planning and Project Approval
Gillot Boulevard Landscape and Irrigation Project
Last Updated: 11/18/2026 Category: Landscape Current Phase: Planning and Project Approval
Beautification of Gillot Boulevard between Holton Terrace and Bluestone Street in the entrance median at the request of the MSBU Advisory board.Greater Port Charlotte MSBU Bridge Rehabilitations
Completed Category: Bridges
Greater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043 and #014069