Project Description
This project includes procuring an engineering firm to design the necessary structural repairs, followed by contracting with a construction firm to carry out the rehabilitation work. This project for the Northwest Port Charlotte MSBU includes two bridges -
Bridge #014044 Chamberlain Boulevard over Jupiter Waterway.
Bridge #014045 Chamberlain Boulevard over Apollo Waterway.
Project Location
Bridge #014044 Chamberlain Boulevard over Jupiter Waterway.
Bridge #014045 Chamberlain Boulevard over Apollo Waterway.
Latest Updates
Project Activity - May 2026
Bids were opened on March 18, 2026, with Zep Construction identified as the lowest responsive bidder at $1,870,145.46. The contract was approved by the Board of County Commissioners on April 14, 2026, after which Purchasing will schedule the Pre‑Construction Meeting.
Budget
| Phase | Cost |
|---|---|
| Design | $197,560 |
| Construction | $1,870,145.46 |
Schedule
| Phase | Estimated Start Date | Forecast Completion | Actual Completion |
|---|---|---|---|
| Design Development | 01/29/2024 | 10/03/2025 | 12/17/2025 |
Project Phase
Construction
Last Updated
05/13/2026
Project Manager
Kelly Slaughter
Public Relations
Chad Ray
Email Public Relations
Project Number
2024001656
Sponsor Department
Public Works
Design Engineer/Architect
DRMP Engineering
Construction Contractor
Zep Construction