Peace River Shores Boulevard Road Crossing Pipe Replacements
Completed 05/04/2026 Category: Roadway
Railroad and stormwater pipe enhancements across Peace River Shores BoulevardRiverside Drive Road Crossing Pipe Replacements
Last Updated: 05/04/2026 Category: Roadway Current Phase: Planning and Project Approval
Stormwater pipe replacements across Riverside Drive between Huckeby Road and Sunny Harbor DriveSR 776 - Murdock Circle to Myakka River Bridge Median Landscape Project
Last Updated: 05/04/2026 Category: Landscape Current Phase: Design Development
The county, with funding from FDOT, shall construct and maintain landscaping in the median of SR 776 between Murdock Circle and the Myakka River Bridge.Burnt Store Water Reclamation Facility Expansion
Last Updated: 05/01/2026 Category: Utilities Current Phase: Design Development
This expansion project will increase wastewater treatment capacity for the Burnt Store service area.Disaster Recovery Site - Oyster Creek Bridge Repair (Hurricane Ian FDOT LAP Project)
Last Updated: 05/01/2026 Category: Disaster Recovery Site Current Phase: Construction
Oyster Creek Bridge Repair (Hurricane Ian FDOT LAP Project)
Disaster Recovery Site - Tom Adams Bridge Emergency Repair - Hurricane Milton
Last Updated: 05/01/2026 Category: Disaster Recovery Site
The Tom Adams Bridge sustained damage from Hurricane Milton, necessitating emergency repairs.
Last Updated: 05/01/2026 Category: Roadway Current Phase: Design Development
Flamingo/Edgewater Widening
Kings Hwy Harborview Rd Intersection Improvements
Last Updated: 05/01/2026 Category: Roadway Current Phase: Construction
Kings Hwy Harborview Rd Intersection Improvements. Traffic signal hardening.Mid-County Mini Transfer & Recycling Facility Roadway Reconfiguration and Truck Entrance
Last Updated: 05/01/2026 Category: Roadway Current Phase: Design Development
The design, permitting, and construction of a new gated access trucking road into the mini-transfer station.