Mid-County Mini Transfer & Recycling Facility Roadway Reconfiguration and Truck Entrance
Last Updated: 05/01/2026 Category: Roadway Current Phase: Design Development
The design, permitting, and construction of a new gated access trucking road into the mini-transfer station.Midway Boulevard Bridge over North Spring Lake - Bridge Rehabilitation
Completed 05/01/2026 Category: Bridges
Midway Boulevard Bridge over North Spring Lake - Bridge #014073Northwest Port Charlotte MSBU Bridge Rehabilitations
Last Updated: 05/01/2026 Category: Bridges Current Phase: Construction
Northwest Port Charlotte MSBU Bridge Rehabilitations - #014044 and #014045Old Landfill Road Safety Improvements
Last Updated: 05/01/2026 Category: Roadway Current Phase: Design Development
Old Landfill Rd safety improvements.Last Updated: 05/01/2026 Category: Drainage Current Phase: Design Development
Removal and disposal of all nuisance and exotic vegetation and trash from approximately 18.65 acres of Oyster Creek.
Sheriff Administration and Hardened 911 Facility
Completed 05/01/2026 Category: Sales Tax Funded Category: County Facilities
Design and construction of a new 62,000-square-foot Law Enforcement Administrative Headquarters for the Charlotte County Sheriff’s Office. This modern facility will be located on County-owned land adjacent to the existing District 3 Headquarters and the Impound, Evidence, and Forensics Facility, bringing multiple law enforcement services together into one coordinated campus.
The new headquarters will replace the current leased building, which was originally repaired after Hurricane Charley and remains vulnerable to severe weather. The upgraded facility will meet the needs of a modern, growing law enforcement agency by providing safer, more efficient, and more resilient space for deputies and staff to serve the community. It will also include a new Emergency 911 Communications Center, ensuring reliable emergency response during critical events.
Last Updated: 05/01/2026 Current Phase: Design Development
Design of a new multi-purpose Special Needs Saferoom and Community Support Facility.
Weir Inspection and Repair Design
Last Updated: 05/01/2026 Category: Drainage Current Phase: Design Development
The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged. The cause of the damage is not known. An engineering firm has been retained to assess these three water control stuctures to determine the extent of the deficincies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.Charlotte Harbor CRA - Melbourne Street Multi-Use Path
Last Updated: 04/30/2026 Category: Sidewalks Current Phase: Design Development
Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview Road.