Tom Adams Bridge Structural Repairs
Last Updated: 10/01/2026 Category: Bridges Current Phase: Construction
Tom Adams Bridge Structural RepairsVarious Intersection Improvements
Last Updated: 10/01/2026 Category: Roadway Current Phase: Design Development
The design and construction of new turn lanes, sidewalk modifications, and traffic signal modifications at various intersections in Charlotte County.Veterans Boulevard at Atwater Intersection Safety Improvements
Last Updated: 10/01/2026 Category: Roadway Current Phase: Design Development
This project includes the design and construction of new turn lanes and traffic signal improvements at the intersection of Veterans Boulevard and Atwater Street.Veterans Boulevard Intersection Improvements
Last Updated: 10/01/2026 Category: Roadway Current Phase: Construction
The design and construction of new turn lanes and sidewalk modifications at various intersections along Veterans Boulevard.
Washington Loop over Prairie Creek Bridge Replacement
Last Updated: 10/01/2026 Category: Bridges Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge ReplacementWashington Loop Road over Shell Creek and Myrtle Slough Bridge Rehabilitations
Last Updated: 10/01/2026 Category: Bridges Current Phase: Design Development
Washington Loop Road Bridges over Shell Creek and Myrtle SloughLast Updated: 09/30/2026 Category: Drainage Current Phase: Design Development
Charlotte County Engineering is proposing to design and implement a canal maintenance program to include dredging the upland freshwater canals to help improve the water quality of the waterways.Last Updated: 09/30/2026 Category: Drainage Current Phase: Design Development
Removal and disposal of all nuisance and exotic vegetation and trash from approximately 18.65 acres of Oyster Creek.Waterway Hurricane Debris Removal-Grant Funded
Completed Category: Drainage
Remove hurricane debris from approximately 37 miles of navigable waterways throughout the county.










