Ainger Creek Boat Ramp Replacement
Last Updated: 06/08/2026 Category: Parks And Recreation Current Phase: Design Development
This project will improve the overall experience for boaters and visitors by enhancing traffic flow, expanding parking efficiency, and adding new amenities. A pre-manufactured restroom facility will be installed to provide greater convenience for users, and the boat ramp will be relocated to help reduce loading and unloading wait times. Together, these improvements will create a safer, more accessible, and more enjoyable waterfront experience for the community.
Englewood East Amenity Replacement
Last Updated: 06/04/2026 Category: Parks And Recreation Current Phase: Construction
Replacement and improvement of playground equipment and shade structure that was damaged during Hurricane Ian along with the installation of an additional pavilion and drinking fountain for community use.
Last Updated: 06/04/2026 Category: Parks And Recreation Current Phase: Construction
Creation of a master plan through the park design process and phase 1 development.South County Regional Park Playground Replacement
Last Updated: 06/04/2026 Category: Parks And Recreation Current Phase: Design Development
Replacement of the existing playground equipment that has reached it's of life cycle. This will include the 5-12 and 2-5 ages play structures. The existing shade canopies will remain and be incorporated into the new equipment layout. Final design's from 3 vendors will be shared with the community so they can vote on the most liked concept. The design with the most votes is what will be installed.
Disaster Recovery Site - Lift Stations
Last Updated: 06/01/2026 Category: Disaster Recovery Site Category: Utilities
Charlotte County experienced extensive damage to fencing, antenna systems and site infrastructure.Last Updated: 05/27/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
GC Herring Phase I design and construction will include two (2) playgrounds including shade structures, one ages 2-5 and one ages 6-12, one large pavilion and two small pavilions, one tennis court, one basketball court, fitness hub with shade structure, multi-purpose field area and exercise trail.Mid-County Library Hurricane Repairs
Completed Category: County Facilities
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.
William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 05/27/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
William R. Gaines Jr. Veterans Memorial Park Phase II design and construction to include one (1) large pavilion, two (2) pickleball courts and sanitary utility connection to the existing park restroom.
Disaster Recovery Site - Airport Road Annex
Completed Category: Disaster Recovery Site
Several county buildings sustained various damages, including torn canopies, roof and siding damage, and structural impacts. Notably, the old Transit building lost its canopy, satellite dish, and antenna. The Supervisor of Elections facilities experienced roof, fascia, and siding damage.







