Last Updated: 09/30/2026 Category: Drainage Current Phase: Design Development
Charlotte County Engineering is proposing to design and implement a canal maintenance program to include dredging the upland freshwater canals to help improve the water quality of the waterways.Last Updated: 09/30/2026 Category: Drainage Current Phase: Design Development
Removal and disposal of all nuisance and exotic vegetation and trash from approximately 18.65 acres of Oyster Creek.Waterway Hurricane Debris Removal-Grant Funded
Completed Category: Drainage
Remove hurricane debris from approximately 37 miles of navigable waterways throughout the county.Weir Inspection and Repair Design
Last Updated: 09/30/2026 Category: Drainage Current Phase: Design Development
The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged. The cause of the damage is not known. An engineering firm has been retained to assess these three water control structures to determine the extent of the deficiencies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.
Atwater Street Sidewalk Project
Last Updated: 09/28/2026 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Initiative.Bayshore Live Oak Playground Restroom
Last Updated: 09/28/2026 Current Phase: Planning and Project Approval
The Bayshore Live Oak Playground Restroom Replacement project will provide a new, modern restroom facility to better serve park visitors. The existing structure was damaged during Hurricanes Milton and Helene and is unsafe to repair or reuse. It will be replaced with a durable, code-compliant building designed for safety, accessibility, and ease of maintenance. The upgraded facility will enhance the overall user experience while supporting the long-term functionality and appearance of the park.
Caring Way and Brinson Avenue Sidewalks
Last Updated: 09/28/2026 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue SidewalksChamberlain Boulevard Sidewalk
Last Updated: 09/28/2026 Category: Sidewalks Current Phase: Design Development
NWPC Chamberlain Blvd. Sidewalk
Cleveland Avenue Sidewalk Project
Last Updated: 09/28/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.





