2024 Road and Bridge Paving Program
Last Updated: 09/16/2026 Category: Roadway Current Phase: Construction
2024 Road and Bridge Paving ProgramLast Updated: 09/16/2026 Category: Utilities Current Phase: Construction
Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.Burnt Store Road East-West Connector
Last Updated: 09/16/2026 Category: Roadway Current Phase: Planning and Project Approval
Charlotte County has undertaken this study in response to the future growth along the Burnt Store Road Corridor.Charlotte County Street Lighting LED Conversion
Last Updated: 09/16/2026 Category: Roadway Current Phase: Planning and Project Approval
Charlotte County is continuing its effort to improve roadway lighting by converting older high-pressure sodium (HPS) fixtures to modern LED technology. The project delivers brighter, more reliable lighting while reducing energy use and long-term maintenance costs.
Disaster Recovery Site - Manasota Key, Don Pedro, Knight Island Beach Erosion
Last Updated: 09/16/2026 Category: Disaster Recovery Site
Hurricane Ian caused severe shoreline erosion at Manasota Key, Don Pedro, and Stump Pass, displacing hundreds of thousands of cubic yards of sand. The dune system and seawalls were heavily damaged, exposing properties to storm risks. Additional damage affected beach fill, mangrove roots, riprap, pavilions, sidewalks, boat ramps, and docks, many of which need repair or replacement.
Disaster Recovery Site - Signs and Lighting
Last Updated: 09/16/2026 Category: Disaster Recovery Site Current Phase:
Charlotte County sustained widespread lighting and signage damage across multiple locations.
Disaster Recovery Site - Tom Adams Bridge
Last Updated: 09/16/2026 Category: Disaster Recovery Site
Hurricane Ian caused extensive damage throughout the site, including damage to roof, exterior areas, electrical and mechanical issues, sidewalks and structure.
Disaster Recovery Site - Winchester Boulevard Signage/Lighting
Last Updated: 09/16/2026 Category: Disaster Recovery Site Current Phase: Planning and Project Approval
This project will consist of replacing all light poles felled by Hurricane Ian.
Don Pedro/Knight Island Beach Renourishment
Last Updated: 09/16/2026 Category: Coastal Current Phase: Planning and Project Approval
The is a major renourishment of the Don Pedro/Knight Island shoreline. This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.