Project Status Updates

Fire Station 3 Replacement

Fire Station 3 Replacement Sales Tax Project

Last Updated: 10/05/2026 Category: County Facilities Category: Sales Tax Funded Current Phase: Construction

Construct a new fire station at a location to be determinded, replacing the old fire station. New fire station will generally conform to a new prototype design for new and replacement stations. Includes land acquisition for station to be located nearby present location.

Read More

Carmalita Skate Park Repairs and Improvements News Image

Carmalita Skate Park Repairs and Improvements

Last Updated: 10/09/2026 Current Phase: Construction

Replacement of the existing aging slab and installation of multiple new pieces of equipment.

Read More

Hillsborough Boulevard Water Main Project News Image

Hillsborough Boulevard Water Main Project

Last Updated: 10/09/2026 Category: Utilities Current Phase: Construction

This project will install an eight-inch water main along Hillsborough Boulevard from Yorkshire Street to U.S. 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.

Read More

Myakka Park News Image

Myakka Park

Last Updated: 10/09/2026 Category: Parks And Recreation Current Phase: Construction

Creation of a master plan through the park design process and phase 1 development.

Read More

South County Regional Park Playground Replacement

South County Regional Park Playground Replacement

Last Updated: 10/09/2026 Category: Parks And Recreation Current Phase: Design Development

Replacement of the existing playground equipment that has reached it's of life cycle. This will include the 5-12 and 2-5 ages play structures. The existing shade canopies will remain and be incorporated into the new equipment layout. Final design's from 3 vendors will be shared with the community so they can vote on the most liked concept. The design with the most votes is what will be installed.

Read More

Disaster Recovery Site - Cultural Center News Image

Disaster Recovery Site - Cultural Center Disaster Recovery Project Site

Last Updated: 10/13/2026 Category: Disaster Recovery Site

Several buildings suffered interior water damage from roof leaks, affecting ceilings, insulation, drywall, flooring, and lighting. Parking and pole lights are leaning, the fire alarm needed resetting, and minor exterior damage occurred to gutters, flashing, and electrical systems. Facility will be demolished and master plan developed for its potential replacement.

Read More

Disaster Recovery Site - Historic Courthouse News Image

Disaster Recovery Site - Historic Courthouse Disaster Recovery Project Site

Last Updated: 10/13/2026 Category: Disaster Recovery Site

The courthouse sustained extensive storm damage, including basement flooding, sinkholes, electrical issues, an inoperable elevator, and water intrusion on multiple floors. Interior damage affected offices, fixtures, and contents, with significant losses in the basement.

Read More

Disaster Recovery Site - Mid-County Recycling Center News Image

Disaster Recovery Site - Mid-County Recycling Center Disaster Recovery Project Site

Last Updated: 10/13/2026 Category: Disaster Recovery Site

The office building and recycling canopy sustained gutter, downspout, canopy, and fascia damage. Ten metal signs and 90 feet of privacy fencing were also damaged and need repair or replacement.

Read More

Cultural Center Replacement News Image

Cultural Center Replacement

Last Updated: 10/15/2026 Category: County Facilities Current Phase: Planning and Project Approval

The Cultural Center Replacement project was approved to move forward with masterplanning and programming by the Board of County Commissioners on March 12th 2024 following a series of public input activities and final presentation. The board granted $750,000 to proceed with advertising for a consultant. Additionally the direction was given to move forward with demolition of the existing facility scheduled for FY26. The full design and permitting phase is scheduled for funding in FY27 with construction funding in FY28.

Read More