Pirate Harbor Maintenance Dredge - Exterior
Last Updated: 10/01/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for maintenance dredging parts of the Pirate Harbor waterway system. This project is for approximately the landward half of the access channel and inland connector canals. The finger canals are not included in this project.
Peachland Boulevard at Harbor Boulevard Intersection Improvements
Last Updated: 10/01/2026 Category: Roadway Current Phase: Design Development
The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.
Last Updated: 09/30/2026 Category: Drainage Current Phase: Design Development
Removal and disposal of all nuisance and exotic vegetation and trash from approximately 18.65 acres of Oyster Creek.Last Updated: 08/14/2026 Current Phase: Construction
Replacement of boardwalk at Oyster Creek Environmental Park.Old Landfill Road Safety Improvements
Last Updated: 10/01/2026 Category: Roadway Current Phase: Design Development
Old Landfill Rd safety improvements.NWPC Bridge Rehabilitation Chamberlain over Cheshire Waterway Project
Last Updated: 10/01/2026 Category: Bridges Current Phase: Design Development
NWPC Bridge Rehabilitation Chamberlain over Cheshire Waterway ProjectNorthwest Port Charlotte MSBU Bridge Rehabilitations
Last Updated: 10/01/2026 Category: Bridges Current Phase: Construction
Northwest Port Charlotte MSBU Bridge Rehabilitations - #014044 and #014045Northwest Port Charlotte Maintenance Dredging - Exterior
Last Updated: 10/01/2026 Category: Coastal Current Phase: Design Development
Design, permitting, and dredging of the exterior parts of the access channels, and the interior parts of the mouths of the Apollo, Venus and Cheshire channels for the Northwest Port Charlotte Waterway MSBU. The project may also include the Juno Waterway.
Last Updated: 09/25/2026 Category: Parks And Recreation Current Phase: Construction
Creation of a master plan through the park design process and phase 1 development.