Peace River Shores Boulevard Road Crossing Pipe Replacements
Completed Category: Roadway
Railroad and stormwater pipe enhancements across Peace River Shores BoulevardPeachland Boulevard at Harbor Boulevard Intersection Improvements
Last Updated: 08/17/2026 Category: Roadway Current Phase: Design Development
The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.
Pirate Harbor Maintenance Dredge - Exterior
Last Updated: 08/14/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for maintenance dredging parts of the Pirate Harbor waterway system. This project is for approximately the landward half of the access channel and inland connector canals. The finger canals are not included in this project.
Placida West Boat Ramp Expansion
Last Updated: 07/15/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak launch, restroom, and parking.Port Charlotte Beach Park Shoreline Stabilization
Last Updated: 08/14/2026 Category: Coastal Category: Parks And Recreation Current Phase: Design Development
Port Charlotte Beach Park Shoreline StabilizationLast Updated: 08/07/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
The existing pool at Port Charlotte Beach Park will be replaced with a community pool suitable for lap swimming, aerobic exercise, therapy, and other special events.
Port Charlotte Beach Recreation Center
Last Updated: 08/07/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
The project replaces the existing facility that has reached its end of life and suffered significant Hurricane damages.
Quesada Avenue Sidewalk and Pedestrian Signal
Completed Category: Sidewalks Category: Sales Tax Funded
Quesada Avenue sidewalk and pedestrian signals
Rampart Boulevard Sidewalk Phase 1 and 2
Last Updated: 08/17/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
Rampart Boulevard Sidewalk Phase 1 and 2








