Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Disaster Recovery Site - Veterans Boulevard Signage/Lighting News Image

Disaster Recovery Site - Veterans Boulevard Signage/Lighting Disaster Recovery Project Site

Last Updated: 08/17/2026

This project will consist of replacing all light poles felled by Hurricane Ian.
 

Read More

Disaster Recovery Site - Water Booster Stations News Image

Disaster Recovery Site - Water Booster Stations Disaster Recovery Project Site

Last Updated: 08/07/2026 Category: Disaster Recovery Site Category: Utilities

Hurricane Ian caused widespread damage to water booster stations.

Read More

Disaster Recovery Site - William R Gaines Jr. Veterans Memorial Park News Image

Disaster Recovery Site - William R Gaines Jr. Veterans Memorial Park Disaster Recovery Project Site

Last Updated: 08/14/2026 Category: Disaster Recovery Site

High winds, windborne debris and localized flooding damaged playgrounds, park amenities, sidewalks, pavilions, buildings, lighting, and fencing.

Read More

Disaster Recovery Site - Winchester Boulevard Signage/Lighting News Image

Disaster Recovery Site - Winchester Boulevard Signage/Lighting Disaster Recovery Project Site

Last Updated: 08/17/2026 Category: Disaster Recovery Site

This project will consist of replacing all light poles felled by Hurricane Ian.

Read More

Don Pedro/Knight Island Beach Renourishment

Don Pedro/Knight Island Beach Renourishment

Last Updated: 08/17/2026 Category: Coastal Current Phase: Planning and Project Approval

The is a major renourishment of the Don Pedro/Knight Island shoreline.  This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.  

Read More

Dorchester Street Sidewalk

Dorchester Street Sidewalk

Last Updated: 08/17/2026 Category: Sidewalks Current Phase: Construction

 Dorchester Street Sidewalk

Read More

East Port Water Reclamation Facility Expansion News Image

East Port Water Reclamation Facility Expansion

Last Updated: 02/23/2026 Category: Utilities Current Phase: Construction

This project includes the expansion of the current water reclamation facility to treat six million gallons of wastewater per day to nine million gallons per day. The project also includes advanced wastewater treatment, which is a valuable addition to the treatment process to ensure treated water has as low concentrations of nutrients as possible.

Read More

Englewood East Amenity Replacement News Image

Englewood East Amenity Replacement

Completed Category: Parks And Recreation

Replacement and improvement of playground equipment and shade structure that was damaged during Hurricane Ian along with the installation of an additional pavilion and drinking fountain for community use.

Read More

EOC Expansion News Image

EOC Expansion

Last Updated: 08/07/2026 Current Phase: Design Development

The continued growth of Charlotte County requires an enhanced disaster response through a whole community approach and collaborative problem solving to ensure timely protective actions, a more educated, informed and prepared population and resilient infrastructure.

Read More

View Full Projects Map

Delivering Exceptional Service

Questions? Issues?

Contact Us