Last Updated: 09/28/2026 Category: Sidewalks Current Phase: Design Development
Sun-Trail Multi-purpose pathway
William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 09/28/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
William R. Gaines Jr. Veterans Memorial Park Phase II design and construction to include one (1) large pavilion, two (2) pickleball courts and sanitary utility connection to the existing park restroom.Last Updated: 09/25/2026 Category: Parks And Recreation Current Phase: Construction
Creation of a master plan through the park design process and phase 1 development.South County Regional Park Playground Replacement
Last Updated: 09/25/2026 Category: Parks And Recreation Current Phase: Design Development
Replacement of the existing playground equipment that has reached it's of life cycle. This will include the 5-12 and 2-5 ages play structures. The existing shade canopies will remain and be incorporated into the new equipment layout. Final design's from 3 vendors will be shared with the community so they can vote on the most liked concept. The design with the most votes is what will be installed.Last Updated: 09/22/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
GC Herring Phase I design and construction will include two (2) playgrounds including shade structures, one ages 2-5 and one ages 6-12, one large pavilion and two small pavilions, one tennis court, one basketball court, fitness hub with shade structure, multi-purpose field area and exercise trail.
Disaster Recovery Site - Ainger Creek Park
Last Updated: 09/21/2026 Category: Disaster Recovery Site
The site suffered significant waterfront and structural damage, including erosion, seawall displacement, and exposed mangrove roots. Several piers were damaged, along with the boat ramp, storm drain protections, and shoreline. Storm surges caused waterway fill, requiring dredging and reinforcement. Additional damage affected parking bumpers, containers, and signage.
Disaster Recovery Site - Allapatchee Shores Park
Last Updated: 09/21/2026 Category: Disaster Recovery Site
Erosion to the kayak launch and stormwater outfall areas. Stormwater outfall retention wall damage.
Disaster Recovery Site - Amberjack Environmental Park
Last Updated: 09/21/2026 Category: Disaster Recovery Site
The west boardwalk sustained major structural damage, requiring repairs to stanchions, handrails, bolts, and six deck piles.
Disaster Recovery Site - Anger Fishing Pier
Last Updated: 09/21/2026 Category: Disaster Recovery Site
The area sustained extensive pier damage resulting in total loss of approximately 4,300 sq ft. concrete, timber and composite fishing pier. Erosion of bulkhead and upland walkway with severe loss of rip rap revetment.