Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Weir Inspection and Repair Design

Weir Inspection and Repair Design

Last Updated: 09/30/2026 Category: Drainage Current Phase: Design Development

The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged.  The cause of the damage is not known.  An engineering firm has been retained to assess these three water control structures to determine the extent of the deficiencies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.  

Read More

Atwater Street Sidewalk Project

Atwater Street Sidewalk Project Sales Tax Project

Last Updated: 09/28/2026 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development

The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Initiative.

Read More

Bayshore Live Oak Playground Restroom News Image

Bayshore Live Oak Playground Restroom

Last Updated: 09/28/2026 Current Phase: Planning and Project Approval

The Bayshore Live Oak Playground Restroom Replacement project will provide a new, modern restroom facility to better serve park visitors. The existing structure was damaged during Hurricanes Milton and Helene and is unsafe to repair or reuse. It will be replaced with a durable, code-compliant building designed for safety, accessibility, and ease of maintenance. The upgraded facility will enhance the overall user experience while supporting the long-term functionality and appearance of the park.

Read More

Caring Way and Brinson Avenue Sidewalks

Caring Way and Brinson Avenue Sidewalks Sales Tax Project

Last Updated: 09/28/2026 Category: Sidewalks Current Phase: Design Development

Caring Way and Brinson Avenue Sidewalks

Read More

Chamberlain Boulevard Sidewalk

Chamberlain Boulevard Sidewalk

Last Updated: 09/28/2026 Category: Sidewalks Current Phase: Design Development

NWPC Chamberlain Blvd. Sidewalk

Read More

Cleveland Avenue Sidewalk Project

Cleveland Avenue Sidewalk Project Sales Tax Project

Last Updated: 09/28/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development

The CCBOCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.

Read More

Deep Creek Blvd. Sidewalk

Deep Creek Blvd. Sidewalk

Last Updated: 09/28/2026 Category: Sidewalks Current Phase: Design Development

Deep Creek Blvd. Sidewalk Design

Read More

Dorchester Street Sidewalk

Dorchester Street Sidewalk

Last Updated: 09/28/2026 Category: Sidewalks Current Phase: Turnover and Closeout

 Dorchester Street Sidewalk

Read More

Gasparilla Road Sidewalk (Boca Grande)

Gasparilla Road Sidewalk (Boca Grande)

Last Updated: 09/28/2026 Category: Sidewalks Current Phase: Design Development

This project was requested by the CCBOCC

Read More

View Full Projects Map

Delivering Exceptional Service

Questions? Issues?

Contact Us