Rio Villa Bridge Rehabilitation
Last Updated: 08/14/2026 Category: Bridges Current Phase: Design Development
Rio Villa Bridge RehabilitationSouth Gulf Cove FY24 Bridge Rehabilitations
Last Updated: 08/14/2026 Category: Bridges Current Phase: Turnover and Closeout
South Gulf Cove FY24 Bridge Rehabilitations - Bridges #014065, #014070, #014072South Gulf Cove Maintenance Dredge - Exterior
Last Updated: 08/14/2026 Category: Coastal Current Phase: Planning and Project Approval
Surveying, design, permitting, and construction oversight for maintenance dredging of the South Gulf Cove Exterior Maintenance Dredge Project.
SR776 Turn Lanes at Charlotte Sport Park
Last Updated: 08/14/2026 Category: Roadway Current Phase: Design Development
Design, permitting, and construction of additional turn lanes on sr776 into the Charlotte Sports Park and County Fair grounds. This project is grant funded by the FDOT and will be coordinated and approved through their staff and offices. County staff is managing the project and is the direct contact for the design engineer.Tom Adams Bridge Structural Repairs
Last Updated: 08/14/2026 Category: Bridges Current Phase: Construction
Tom Adams Bridge Structural RepairsWashington Loop over Prairie Creek Bridge Replacement
Last Updated: 08/14/2026 Category: Bridges Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge ReplacementWashington Loop Road over Shell Creek and Myrtle Slough Bridge Rehabilitations
Last Updated: 08/14/2026 Category: Bridges Current Phase: Design Development
Washington Loop Road Bridges over Shell Creek and Myrtle SloughLast Updated: 08/13/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
GC Herring Phase I design and construction will include two (2) playgrounds including shade structures, one ages 2-5 and one ages 6-12, one large pavilion and two small pavilions, one tennis court, one basketball court, fitness hub with shade structure, multi-purpose field area and exercise trail.
William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 08/13/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
William R. Gaines Jr. Veterans Memorial Park Phase II design and construction to include one (1) large pavilion, two (2) pickleball courts and sanitary utility connection to the existing park restroom.







