William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 11/16/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
William R. Gaines Jr. Veterans Memorial Park Phase II design and construction to include one (1) large pavilion, two (2) pickleball courts and sanitary utility connection to the existing park restroom.Allapatchee Shores Park - Stormwater and Parking Enhancements
Last Updated: 11/17/2026 Category: Parks And Recreation Current Phase: Construction
Allapatchee Shores Park - Stormwater and Parking EnhancementsAlligator Creek Maintenance Dredge
Last Updated: 11/17/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of the Alligator Creek main channel.
Ballfield LED Lighting Conversion-Centennial Park Soccer Fields
Last Updated: 11/17/2026 Category: Parks And Recreation Current Phase: Construction
Ballfield LED Lighting Conversion-CP Soccer FieldsBallfield LED Lighting Conversion-HARP Baseball Field #4
Last Updated: 11/17/2026 Category: Parks And Recreation Current Phase: Construction
Ballfield LED Lighting Conversion-HARP Baseball Field #4Bayshore Live Oak Park - West Fishing Pier
Last Updated: 11/17/2026 Category: Parks And Recreation Current Phase: Construction
Total replacement of the western fishing pier at Bayshore Live Oak Park.Bayshore Live Oak Park Seawall Replacement
Last Updated: 11/17/2026 Category: Parks And Recreation Current Phase: Design Development
Bayshore Live Oak Park Seawall ReplacementLast Updated: 11/17/2026 Category: Drainage Current Phase: Design Development
Charlotte County Engineering is proposing to design and implement a canal maintenance program to include dredging the upland freshwater canals to help improve the water quality of the waterways.Last Updated: 11/17/2026 Category: Parks And Recreation Current Phase: Design Development
Cedar Point Pier Replacement



