Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Port Charlotte Beach Pool News Image

Port Charlotte Beach Pool Sales Tax Project

Last Updated: 08/07/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction

The existing pool at Port Charlotte Beach Park will be replaced with a community pool suitable for lap swimming, aerobic exercise, therapy, and other special events. 

Read More

Port Charlotte Beach Recreation Center News Image

Port Charlotte Beach Recreation Center Sales Tax Project

Last Updated: 08/07/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction

The project replaces the existing facility that has reached its end of life and suffered significant Hurricane damages.

Read More

Indian Springs Cemetery Bank Stabilization News Image

Indian Springs Cemetery Bank Stabilization

Last Updated: 08/10/2026 Category: Other Current Phase: Construction

Repair of the bank adjacent to Alligator Creek due to erosion caused by Hurricane Irma in 2017

Read More

Myakka Park News Image

Myakka Park

Last Updated: 08/12/2026 Category: Parks And Recreation Current Phase: Construction

Creation of a master plan through the park design process and phase 1 development.

Read More

South County Regional Park Playground Replacement

South County Regional Park Playground Replacement

Last Updated: 08/12/2026 Category: Parks And Recreation Current Phase: Design Development

Replacement of the existing playground equipment that has reached it's of life cycle. This will include the 5-12 and 2-5 ages play structures. The existing shade canopies will remain and be incorporated into the new equipment layout. Final design's from 3 vendors will be shared with the community so they can vote on the most liked concept. The design with the most votes is what will be installed.

Read More

G.C. Herring Park Phase I News Image

G.C. Herring Park Phase I Sales Tax Project

Last Updated: 08/13/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction

GC Herring Phase I design and construction will include two (2) playgrounds including shade structures, one ages 2-5 and one ages 6-12, one large pavilion and two small pavilions, one tennis court, one basketball court, fitness hub with shade structure, multi-purpose field area and exercise trail.   

Read More

William R Gaines Jr. Veterans Memorial Park Phase II

William R Gaines Jr. Veterans Memorial Park Phase II Sales Tax Project

Last Updated: 08/13/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction

William R. Gaines Jr. Veterans Memorial Park Phase II design and construction to include one (1) large pavilion, two (2) pickleball courts and sanitary utility connection to the existing park restroom.

Read More

Ainger Creek Bridge - Emergency Repair

Ainger Creek Bridge - Emergency Repair

Last Updated: 08/14/2026 Category: Bridges Current Phase: Construction

Ainger Creek Bridge - Emergency Repair

Read More

Allapatchee Shores Park - Stormwater and Parking Enhancements

Allapatchee Shores Park - Stormwater and Parking Enhancements

Last Updated: 08/14/2026 Category: Parks And Recreation Current Phase: Construction

Allapatchee Shores Park - Stormwater and Parking Enhancements

Read More

View Full Projects Map

Delivering Exceptional Service

Questions? Issues?

Contact Us