Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Design Development
Cedar Point Pier ReplacementCharlotte Harbor Event Center Seawall Replacement
Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Design Development
Charlotte Harbor Event Center Seawall ReplacementDarst Park Shoreline and Boarding Pier Repairs
Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Design Development
Darst Park Shoreline and Boarding Pier RepairsLast Updated: 08/28/2026 Category: County Facilities Category: Sales Tax Funded Current Phase: Construction
Construct a new fire station at a location to be determinded, replacing the old fire station. New fire station will generally conform to a new prototype design for new and replacement stations. Includes land acquisition for station to be located nearby present location.
Placida West Boat Ramp Expansion
Last Updated: 08/28/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak launch, restroom, and parking.Port Charlotte Beach Park Shoreline Stabilization
Last Updated: 08/28/2026 Category: Coastal Category: Parks And Recreation Current Phase: Design Development
Port Charlotte Beach Park Shoreline Stabilization
South County Annex Replacement
Last Updated: 08/28/2026 Category: County Facilities Category: Sales Tax Funded Current Phase: Design Development
The current Annex has reached the end of life, and stands in a high risk flood zone. The project will include master planning the current and future needs of stakeholders as well as site feasibility to determine the best location for a new building. The primary function of the South County Annex is to serve the regional community with governement services that include the Tax Collector, Property Appraiser, Supervisor of Elections and Board of County Commissioners.
Disaster Recovery Site - South Gulf Cove Access Channel
Last Updated: 09/01/2026 Category: Disaster Recovery Site
Hurricane Ian caused land-based washouts and runoff into MSBU-maintained navigable waterways.
Disaster Recovery Site - Bayshore Road Signage/Lighting
Last Updated: 09/02/2026
This project will consist of replacing all light poles felled by Hurricane Ian.