Washington Loop over Prairie Creek Bridge Replacement
Last Updated: 08/17/2026 Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge ReplacementWaterway Hurricane Debris Removal-Grant Funded
Last Updated: 08/17/2026 Category: Drainage Current Phase: Turnover and Closeout
Remove hurricane debris from approximately 37 miles of navigable waterways throughout the county.Weir Inspection and Repair Design
Last Updated: 08/17/2026 Category: Drainage Current Phase: Design Development
The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged. The cause of the damage is not known. An engineering firm has been retained to assess these three water control structures to determine the extent of the deficiencies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.Willmington Boulevard Sidewalk
Last Updated: 08/17/2026 Category: Sidewalks Current Phase: Planning and Project Approval
Willmington Boulevard SidewalkLast Updated: 08/19/2026 Category: Sidewalks Current Phase: Design Development
Sun-Trial Multi-purpose pathway



