Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Washington Loop over Prairie Creek Bridge Replacement

Washington Loop over Prairie Creek Bridge Replacement

Last Updated: 08/17/2026 Current Phase: Design Development

Washington Loop Road Bridge over Prairie Creek - Bridge Replacement

Read More

Waterway Hurricane Debris Removal-Grant Funded News Image

Waterway Hurricane Debris Removal-Grant Funded

Last Updated: 08/17/2026 Category: Drainage Current Phase: Turnover and Closeout

Remove hurricane debris from approximately 37 miles of navigable waterways throughout the county.

Read More

Weir Inspection and Repair Design

Weir Inspection and Repair Design

Last Updated: 08/17/2026 Category: Drainage Current Phase: Design Development

The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged.  The cause of the damage is not known.  An engineering firm has been retained to assess these three water control structures to determine the extent of the deficiencies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.  

Read More

Willmington Boulevard Sidewalk

Willmington Boulevard Sidewalk

Last Updated: 08/17/2026 Category: Sidewalks Current Phase: Planning and Project Approval

Willmington Boulevard Sidewalk

Read More

Sun-Trial segment 1-2

Sun-Trial segment 1-2

Last Updated: 08/19/2026 Category: Sidewalks Current Phase: Design Development

Sun-Trial Multi-purpose pathway

Read More

View Full Projects Map

Delivering Exceptional Service

Questions? Issues?

Contact Us