Last Updated: 08/17/2026 Category: Sidewalks Current Phase: Design Development
Gulf Cove SidewalksGulf Cove Interior Canal Design and Maintenance Dredge Project
Last Updated: 08/17/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of parts of the Gulf Cove interior waterways to the 4' MLW maintenance depth.
Greater Port Charlotte MSBU Bridge Rehabilitations
Last Updated: 08/14/2026 Category: Bridges Current Phase: Construction
Greater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043 and #014069Gillot Boulevard Landscape and Irrigation Project
Last Updated: 08/17/2026 Category: Landscape Current Phase: Planning and Project Approval
Beautification of Gillot Boulevard between Holton Terrace and Bluestone Street in the entrance median at the request of the MSBU Advisory board.Gasparilla Road/Pioneer Trail Sidewalk Extension
Last Updated: 08/17/2026 Current Phase: Planning and Project Approval
Gasparilla Road Sidewalk (Boca Grande)
Last Updated: 08/17/2026 Category: Sidewalks Current Phase: Design Development
This project was requested by the CCBOCCGasparilla Road Intersections Signalization
Last Updated: 08/14/2026 Category: Roadway Current Phase: Design Development
Signalization project for the intersection of Gasparilla Road and Rotonda East Boulevard and the intersection of Gasparilla Road and Ingram/Ingraham BoulevardsLast Updated: 08/17/2026 Category: Sidewalks Current Phase: Planning and Project Approval
Gasparilla Pines Boulevard PathwayLast Updated: 08/13/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
GC Herring Phase I design and construction will include two (2) playgrounds including shade structures, one ages 2-5 and one ages 6-12, one large pavilion and two small pavilions, one tennis court, one basketball court, fitness hub with shade structure, multi-purpose field area and exercise trail.





