Last Updated: 10/01/2026 Category: Roadway Current Phase: Construction
Widen Kings Highway to a 4 lane divided roadwayIndian Trail/Springwater Dr Street Light Replacement
Completed Category: Roadway
Remove and replace all HPS streetlights with new solar lights and poles. The light poles being replaced are 40 years old.Indian Springs Cemetery Bank Stabilization
Last Updated: 09/21/2026 Category: Other Current Phase: Construction
Repair of the bank adjacent to Alligator Creek due to erosion caused by Hurricane Irma in 2017Hillsborough Boulevard Water Main Project
Last Updated: 08/24/2026 Category: Utilities Current Phase: Construction
This project will install an eight-inch water main along Hillsborough Boulevard from Yorkshire Street to U.S. 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.
Harbor Heights Tennis/Pickleball Court Renovation
Completed
Reconstruction of the existing tennis/pickleball courts at Harbor Heights Park.Harbor Boulevard Intersection Improvements
Last Updated: 09/16/2026 Category: Roadway Current Phase: Planning and Project Approval
This project incorporates the design of safety improvements to the intersection of Harbor Boulevard and Access Road.Last Updated: 09/28/2026 Category: Sidewalks Current Phase: Design Development
Gulf Cove SidewalksGulf Cove Interior Canal Design and Maintenance Dredge Project
Last Updated: 10/01/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of parts of the Gulf Cove interior waterways to the 4' MLW maintenance depth.
Greater Port Charlotte MSBU Bridge Rehabilitations
Last Updated: 10/01/2026 Category: Bridges Current Phase: Turnover and Closeout
Greater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043 and #014069