Bayshore Live Oak Park - West Fishing Pier
Last Updated: 08/14/2026 Category: Parks And Recreation Current Phase: Construction
Total replacement of the western fishing pier at Bayshore Live Oak Park.Ballfield LED Lighting Conversion-HARP Baseball Field #4
Last Updated: 08/14/2026 Category: Parks And Recreation Current Phase: Construction
Ballfield LED Lighting Conversion-HARP Baseball Field #4Ballfield LED Lighting Conversion-Centennial Park Soccer Fields
Last Updated: 08/14/2026 Category: Parks And Recreation Current Phase: Construction
Ballfield LED Lighting Conversion-CP Soccer Fields
Atwater Street Sidewalk Project
Last Updated: 08/17/2026 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Initiative.Alligator Creek Maintenance Dredge
Last Updated: 08/14/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of the Alligator Creek main channel.
Allapatchee Shores Park - Stormwater and Parking Enhancements
Last Updated: 08/14/2026 Category: Parks And Recreation Current Phase: Construction
Allapatchee Shores Park - Stormwater and Parking EnhancementsAinger Creek Bridge - Emergency Repair
Last Updated: 08/14/2026 Category: Bridges Current Phase: Construction
Ainger Creek Bridge - Emergency RepairAinger Creek Boat Ramp Replacement
Last Updated: 07/10/2026 Category: Parks And Recreation Current Phase: Design Development
This project will improve the overall experience for boaters and visitors by enhancing traffic flow, expanding parking efficiency, and adding new amenities. A pre-manufactured restroom facility will be installed to provide greater convenience for users, and the boat ramp will be relocated to help reduce loading and unloading wait times. Together, these improvements will create a safer, more accessible, and more enjoyable waterfront experience for the community.






