Last Updated: 06/12/2026 Category: Utilities Current Phase: Planning and Project Approval
The Utilities Department is building its first ever water tower.Waterway Hurricane Debris Removal-Grant Funded
Last Updated: 08/17/2026 Category: Drainage Current Phase: Turnover and Closeout
Remove hurricane debris from approximately 37 miles of navigable waterways throughout the county.Weir Inspection and Repair Design
Last Updated: 08/17/2026 Category: Drainage Current Phase: Design Development
The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged. The cause of the damage is not known. An engineering firm has been retained to assess these three water control structures to determine the extent of the deficiencies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.
William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 08/13/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
William R. Gaines Jr. Veterans Memorial Park Phase II design and construction to include one (1) large pavilion, two (2) pickleball courts and sanitary utility connection to the existing park restroom.Willmington Boulevard Sidewalk
Last Updated: 08/17/2026 Category: Sidewalks Current Phase: Planning and Project Approval
Willmington Boulevard Sidewalk