Gasparilla Road/Pioneer Trail Sidewalk Extension
Last Updated: 08/17/2026 Current Phase: Planning and Project Approval
Gillot Boulevard Landscape and Irrigation Project
Last Updated: 08/17/2026 Category: Landscape Current Phase: Planning and Project Approval
Beautification of Gillot Boulevard between Holton Terrace and Bluestone Street in the entrance median at the request of the MSBU Advisory board.
Greater Port Charlotte MSBU Bridge Rehabilitations
Last Updated: 08/14/2026 Category: Bridges Current Phase: Construction
Greater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043 and #014069Gulf Cove Interior Canal Design and Maintenance Dredge Project
Last Updated: 08/17/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of parts of the Gulf Cove interior waterways to the 4' MLW maintenance depth.
Last Updated: 08/17/2026 Category: Sidewalks Current Phase: Design Development
Gulf Cove SidewalksHarbor Boulevard Intersection Improvements
Last Updated: 08/17/2026 Category: Roadway Current Phase: Planning and Project Approval
This project incorporates the design of safety improvements to the intersection of Harbor Boulevard and Access Road.Harbor Heights Tennis/Pickleball Court Renovation
Completed
Reconstruction of the existing tennis/pickleball courts at Harbor Heights Park.Hillsborough Boulevard Water Main Project
Last Updated: 07/02/2026 Category: Utilities Current Phase: Construction
This project will install an eight-inch water main along Hillsborough Boulevard from Yorkshire Street to U.S. 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.
Indian Springs Cemetery Bank Stabilization
Last Updated: 08/10/2026 Category: Other Current Phase: Construction
Repair of the bank adjacent to Alligator Creek due to erosion caused by Hurricane Irma in 2017