Gulf Cove Interior Canal Design and Maintenance Dredge Project
Last Updated: 10/01/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of parts of the Gulf Cove interior waterways to the 4' MLW maintenance depth.
Last Updated: 09/28/2026 Category: Sidewalks Current Phase: Design Development
Gulf Cove SidewalksHarbor Boulevard Intersection Improvements
Last Updated: 09/16/2026 Category: Roadway Current Phase: Planning and Project Approval
This project incorporates the design of safety improvements to the intersection of Harbor Boulevard and Access Road.Harbor Heights Tennis/Pickleball Court Renovation
Completed
Reconstruction of the existing tennis/pickleball courts at Harbor Heights Park.Hillsborough Boulevard Water Main Project
Last Updated: 08/24/2026 Category: Utilities Current Phase: Construction
This project will install an eight-inch water main along Hillsborough Boulevard from Yorkshire Street to U.S. 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.
Indian Springs Cemetery Bank Stabilization
Last Updated: 09/21/2026 Category: Other Current Phase: Construction
Repair of the bank adjacent to Alligator Creek due to erosion caused by Hurricane Irma in 2017Indian Trail/Springwater Dr Street Light Replacement
Completed Category: Roadway
Remove and replace all HPS streetlights with new solar lights and poles. The light poles being replaced are 40 years old.Last Updated: 10/01/2026 Category: Roadway Current Phase: Construction
Widen Kings Highway to a 4 lane divided roadwayKings Hwy Harborview Rd Intersection Improvements
Last Updated: 10/01/2026 Category: Roadway Current Phase: Construction
Kings Hwy Harborview Rd Intersection Improvements. Traffic signal hardening.







